You are here
Socket - Belton, Micalex, 8 Pin, Octal PC Mount, Long Lead
SKU: | P-ST8-209MIPPCL |
Item ID: | 003362 |
Price: $3.85
In Stock
Belton 8-pin Micalex PC mount tube socket with long leads commonly used for octal based power, preamp, and rectifier tubes. Applicable for use with all types of electronic equipment using vacuum tubes.
- Convenient top or bottom mount capabilities
- 1-1/4” chassis hole required
- 1-1/2” oblong mounting centers
Features:
- Paddle saddle mounting
- Easy mount with the saddle of extruded screw hole
- Phosphorous bronze pin terminal with tin plating
- Glassfiber filled PPS Insulating material
- Long leads
UPC/EAN: 609722131810
Belton Part Number: VT8-PT
RoHS Compliant
My Project Lists
Specifications, Files, and Documents
Questions and Answers
Click each question to see its answers.
Prefer browsing the desktop version?
Click here to return to the desktop version of this site
Click here to return to the desktop version of this site
Product Reviews